The Consequences of Squeezing Garage Floor Coatings into a Single Day Installation

Picture this: you’ve just had your garage floor coated, and it looks perfect. Six months later, you notice blisters forming under the surface. A year in, sections begin to peel.

What happened? In most cases, the problem starts on day one, when a contractor decided to skip a critical step — applying a moisture-mitigating epoxy primer. They do it in the name of speed, and they sacrifice a good deal of quality along the way.

Are polyurea-polyaspartic coatings good for hot tire resistance?

Polyurea and polyaspartic coatings are ideal for chemical resistance, UV stability, and scratch resistance. However, when applied directly to concrete, their quick curing properties can limit hot tire pick-up resistance. To improve performance in this regard, a moisture-mitigating epoxy-based primer should be applied first. This primer enhances adhesion and helps prevent hot tire-related issues, ensuring a more durable and resistant coating system.

Are your coating systems UV-resistant and non-yellowing?

Yes, our coating systems are UV resistant and non-yellowing, thanks to the use of 100% solids polyaspartic coatings. We always apply two coats—never just one—over our UV-stable colored chip blends to ensure maximum protection and durability. This approach provides exceptional UV resistance, keeping the decorative flakes vibrant and the surface looking new for many years.

Can garage floor coatings be installed in cold or humid climates?

Yes, at GarageFloorCoating.com, our coating systems are specially engineered to perform in a wide range of environments—including extreme heat, freezing temperatures, and high humidity. No matter the climate, our industrial-grade products deliver long-lasting durability and reliable performance year-round.

We use industrial-grade resins manufactured exclusively by Eco-CorFlex Industrial Polymers, which are formulated to cure properly even in challenging environmental conditions. Whether it’s high humidity or colder temperatures, our experienced installers adjust installation techniques and cure schedules to ensure a proper bond and long-lasting durability.

Unlike many “one-day” coating companies that rely on fast-curing polyaspartics vulnerable to moisture interference, we always start with a moisture-mitigating epoxy primer, allowing our coatings to perform reliably in garages across all regions and seasons.

No shortcuts. No seasonal limitations. Just beautiful, high-performance floors—installed right the first time.

Do you offer a warranty against hydrostatic pressure?

Yes, we do. At GarageFloorCoating.com, we offer a lifetime warranty that includes protection against hydrostatic pressure and all other moisture-related issues—something most “1-day” coating companies specifically exclude.

Hydrostatic pressure, which occurs when moisture vapor pushes up through the concrete slab, is one of the leading causes of coating failure. That’s why we never skip moisture testing and always apply a moisture-mitigating epoxy primer as the foundation of every system. This critical step ensures proper adhesion and long-term durability—even in high-moisture environments like residential garages.

Our coatings are built to last, and our warranty backs it up.

The Shortcut That Costs Homeowners Big

Here’s what the “one-day” companies around Nashville won’t tell you: Instead of installing a 100% solids epoxy moisture vapor barrier first, they apply polyaspartic or polyurea coatings directly to the bare concrete. Those topcoats cure fast — so fast that they can’t fully penetrate the surface. Without proper absorption, moisture vapor gets trapped beneath, creating pressure that pushes the coating away from the concrete.

Your garage floor, business floor, home gym, industrial warehouse space — you’ll see them degrade before your very eyes, often in a couple years, sometimes even in months. You’re supposed to see 20+ years out of these kinds of floors.

What the Experts Recommend

From Sherwin-Williams’ General Polymers and Benjamin Moore’s Corotech to Sika, Tnemec, BASF, Euclid Chemical, Stonhard, and Eco-CorFlex Industrial Polymers, the advice is consistent:

  • Always perform moisture testing before coating concrete.
  • Always apply a moisture vapor barrier epoxy primer before polyaspartic or polyurea topcoats.

Simple. Straightforward. Even ArmorPoxy and VersaFlex — both makers of polyaspartic and polyurea products — specify that these formulas are designed for use as topcoats, not as primers on bare concrete.

Why Industry Standards Back the Primer-First Approach

ASTM International, the American Concrete Institute (ACI), the International Concrete Repair Institute (ICRI), and AMPP all set best practices that start with moisture testing, proper surface preparation, and the application of epoxy-based vapor barriers. ASTM F3010 defines the benchmark for moisture vapor control beneath resinous coatings, and ignoring it often voids warranties.

Skipping this step is especially risky in Nashville, where seasonal humidity swings can push slab moisture levels well above safe thresholds.

Do you offer color and design customization?

At GarageFloorCoating.com, we offer extensive color and design customization to match your style, space, and vision.

Choose from a wide range of flake blends, metallics, solid colors, and our exclusive Mica Stone blends, a proprietary option only available through GarageFloorCoating.com. Whether you’re looking for something subtle and classic or bold and modern, our customizable design options let you create a floor that’s uniquely yours.

Our goal isn’t just durability; it’s delivering a floor that looks as stunning as it performs.

How does diamond grinding improve coating adhesion?

We use 800 lbs Lavina diamond grinding equipment to properly prepare the concrete surface and ensure long-term adhesion of our multi-layer coating systems.

This process is critical because:

✅ It creates an ideal surface profile – Diamond grinding removes the smooth surface layer of concrete typically called the “Cream Layer” not only does it produce a textured finish (profile), by removing this natural protective concrete layer it

At GarageFloorCoating.com, proper surface preparation isn’t an afterthought—it’s the foundation of a beautiful, long-lasting floor.

How does GarageFloorCoating.com handle cracks in the concrete?

At GarageFloorCoating.com, our crack repair system goes far beyond cosmetic patching, it’s engineered for permanent structural reinforcement.

While most companies (especially “one-day” installers) use fast-setting fillers that shrink, crack, or fail over time, we take a comprehensive and advanced approach:

✅ Deep-penetrating, moisture mitigating repair materials – We use high-performance moisture mitigating urethane epoxy hybrid-based menders that chemically bond to the concrete permanently and prevent cracks from reappearing beneath the coating.

✅ Crack stitching with carbon fiber – For structural or recurring cracks, we implement a crack stitching repair system. This involves embedding multiple carbon fiber stitches directly into the concrete, dramatically increasing tensile strength and preventing future movement or separation.

✅ Integrated into a full preparation system – Our crack repairs are just one part of a broader surface preparation process that includes diamond grinding, moisture mitigating, and a multi-layer, full-broadcast coating system for unmatched durability.

In short, we don’t just fill cracks—we stabilize them for life, using the same reinforcement techniques found in commercial and industrial concrete repair.

When you choose GarageFloorCoating.com, you’re choosing professional-grade repairs, not shortcuts.

How long does a full-chip epoxy garage floor coating last?

At GarageFloorCoating.com, our full-chip Moisture Mitigation Epoxy Polyaspartic  floor coating systems are designed for maximum durability and longevity.

When properly installed with our multi-layer, moisture-mitigating system and maintained as recommended, your coating can last 30 years or more.   Unlike “one-day” polyurea polyaspartic systems that skip critical moisture mitigation, our industrial-grade coatings include a 100% solids vapor barrier primer, full-broadcast chip application, and 2 100% solids polyaspartic topcoats, thus eliminating the possibility of peeling, staining, hot tire lift, and UV degradation.

In fact, we’re so confident in our systems that we offer a lifetime warranty against any type of peeling (aka delamination) even due to moisture-related issues—something you simply won’t find elsewhere.

Want it to last decades? Then skip the shortcuts. Go full chip. Go GarageFloorCoating.com.

Can garage floor coatings be installed in cold or humid climates?

Yes, at GarageFloorCoating.com, our coating systems are specially engineered to perform in a wide range of environments, including extreme heat, freezing temperatures, and high humidity. No matter the climate, our industrial-grade products deliver long-lasting durability and reliable performance year-round.

We use industrial-grade resins manufactured exclusively by Eco-CorFlex Industrial Polymers, which are formulated to cure properly even in challenging environmental conditions. Whether it’s high humidity or colder temperatures, our experienced installers adjust installation techniques and cure schedules to ensure a proper bond and long-lasting durability.

Unlike many “one-day” coating companies that rely on fast-curing polyaspartics vulnerable to moisture interference, we always start with a moisture-mitigating epoxy primer, allowing our coatings to perform reliably in garages across all regions and seasons.

No shortcuts. No seasonal limitations. Just beautiful, high-performance floors—installed right the first time.

The Fine Print on Moisture Warranties

Most “one-day” companies exclude moisture-related issues from their warranties. If they offer coverage at all, it’s usually capped at extremely low moisture vapor emission rates — around 3–4 lbs per 1,000 sq ft per 24 hours (ASTM F1869) or 75–80% relative humidity (ASTM F2170). Real-world garage floors, even in dry spells, often exceed 5–10 lbs MVER or 85–100% RH, making these warranties nearly impossible to claim against.

A true moisture vapor barrier epoxy, like Eco-CorFlex MME, can handle up to 100% RH and 20 lbs MVER or more, enabling warranties that actually mean something.

How We Do It at GarageFloorCoating.com Nashville

We never skip moisture testing. We never apply polyaspartic or polyurea directly to bare concrete. Every system we install starts with a moisture-mitigating epoxy primer, ensuring long-term adhesion and protection against vapor damage.

That’s exactly why our warranties include moisture-related failures. Our floors are built to withstand real-world conditions, not just lab tests.

If you want a floor that lasts (often over 20 years), choose the slower, proven process over the quick fix. Your garage (and your wallet) will thank you.

Need a concrete floor coating?

Request a Free Quote

"*" indicates required fields

Epoxy flooring concrete preparation of commercial space with high-end Lavina diamond grinders

Beautiful interior metallic epoxy flooring in basement

Large commercial space coated with gray high gloss epoxy flooring